20260507_LEED v5 Cities_PC2 Final RS File - Page 090
Extracted Content
2EC CREDIT: INFRASTRUCTURE ENERGY EFFICIENCY
ECc3
1–3 points
Intent
To deliver reliable, affordable, and environmentally responsible public infrastructure services to residents.
Requirements
| Achievement Pathways Points | Col2 |
|---|---|
| Cities | 1–3 |
| Option 1. Street Lighting | 1 |
| AND/OR | |
| Option 2. Water and Wastewater System | 1–3 |
| Path 1. Energy and Carbon Disclosure | 1 |
| AND/OR | |
| Path 2. Energy Audit | 1 |
| AND/OR | |
| Path 3. Optimized Energy Performance | 2–3 |
Comply with any combination of the following options for a maximum of 3 points.
Option 1. Street Lighting (1 point)
Ensure 75% of streetlights meet or exceed a luminous efficacy of 100 lumens per watt .
AND/OR
Option 2. Water and Wastewater System (1–3 points)
PATH 1. ENERGY AND CARBON DISCLOSURE (1 POINT)
Track, benchmark, and report the energy consumption and carbon emissions of water and
wastewater systems within the city at intervals of at least one month. Report data by energy
source for the most recent reporting year.
Include energy consumption and carbon emissions associated with the systems’ operation
(collection, treatment, and distribution/disposal), with optional reporting of methane leaks and
flaring.
90