855773644-LEED-v5-BD-C-Reference-Guide-Launch-Edition - Page 092

Extracted Content

Project
types
OptionsPathsDocumentation
the location of the project functional entry and the
stop(s).
Weekday and weekend route schedules showing the
frequency of trips and service.
For any planned transit service, documentation of
planned transit stops and stations sited, funded, and
under construction by the date of the project’s
certificate of occupancy and scheduled for completion
within 24 months of that date.
Path 2. Project-
Sponsored
Transit Service
Description of project-sponsored service and shelters
meeting credit criteria.
Path 2. Project-
Sponsored
Transit Service
Vicinity map indicating the project location, location of
the transit stop(s), route(s) serving each stop, and the
walking routes (with walking distance noted) between
the location of the project functional entry and the
stop(s).
Path 2. Project-
Sponsored
Transit Service
Weekday and weekend route schedules showing the
frequency of trips and service.
Path 2. Project-
Sponsored
Transit Service
Verification (e.g., letter of assurance or agreement,
etc.) that transit service will be provided for at least
three years from the project’s certificate of occupancy.
Option 3.
Walkable
Location
Location
Efficiency
Walk Score® document (e.g., screenshot) showing the
score for the project’s address.
Option 3.
Walkable
Location
Location
Efficiency
Project’s Walk Score®.
Option 3.
Walkable
Location
Public UsesVicinity map and table of uses identified by type of
uses accessible within 0.5 miles (800 meters) walking
distances.
SchoolsOption 4.
Surrounding
Density and
Development
Path 1.
Surrounding
Density
Same as Option 1.
SchoolsOption 4.
Surrounding
Density and
Development
Path 2.
Connected Site
Documentation confirming previous developed status
of the site.
SchoolsOption 4.
Surrounding
Density and
Development
Path 2.
Connected Site
Percent of contiguous project perimeter or boundary
bordering previously developed parcels (must be at
least 25% for adjacent site status).
SchoolsOption 4.
Surrounding
Density and
Development
Path 2.
Connected Site
Percent of project perimeter or boundary bordering
previously developed parcels (must be at least 75%
for infill status).
SchoolsOption 4.
Surrounding
Density and
Development
Path 2.
Connected Site
Site plan or vicinity map showing previously developed
parcels adjacent to the project boundary with notes
confirming adjacent or infill site status.
SchoolsOption 5.
Access to
Transit or
Pedestrian
Access
Path 1. Access
to Transit
Same as Option 2.
SchoolsOption 5.
Access to
Transit or
Pedestrian
Access
Path 2.
Pedestrian
Access
Vicinity map showing walkshed boundary for each
grade/age level, functional entry of school building and
estimated calculations of dwelling units (%) within
each walkshed boundary.
SchoolsOption 5.
Access to
Transit or
Pedestrian
Access
Path 2.
Pedestrian
Access
Confirmation of pedestrian access to the site from all
residential areas in the attendance boundary.

U.S. Green Building Council LEED v5 Reference Guide for Building Design and Construction, April 2025 Launch Edition 82