855773644-LEED-v5-BD-C-Reference-Guide-Launch-Edition - Page 105

Extracted Content

access to basic bicycle repair tools and air-pump stations. This proactive support ensures that bicycles remain in good working condition and encourages more individuals to adopt active commuting as part of their daily routine.

The maintenance facility must be permanently secured and should remain in the same place, so users know where to find it when needed. Repairs are often needed at unexpected and inconvenient times, so predictability is key. The tools should accommodate typical repairs and be securely fastened so they do not go missing. Locating the repair facility in the area dedicated to long-term bicycle storage ensures it is conveniently located.

Project teams are required to provide a description of the available bicycle services and facilities, along with a map or site plan indicating the location of the bicycle repair station within the designated long-term bicycle storage area to ensure that occupants are aware of where to access these resources, making it easier for them to maintain their bicycles, and promote a cycling-supportive environment.

DOCUMENTATION
Project
types
OptionsPathsDocumentation
AllAllNot Claiming
TDA Exemption
USGBC TDM assessment calculator.
AllAllNot Claiming
TDA Exemption
Baseline VMT.
AllAllNot Claiming
TDA Exemption
Proposed VMT.
AllAllNot Claiming
TDA Exemption
Baseline emissions from VMT.
AllAllNot Claiming
TDA Exemption
Proposed emissions from VMT.
AllAllNot Claiming
TDA Exemption
Description of availability of alternative low-carbon and
active travel options.
AllAllClaiming TDA
Exemption
Documentation showing participation in a local or
regional government mandated TDM program.
AllAllClaiming TDA
Exemption
Documentation showing project is an affordable
housing project in an infill location.
AllAllClaiming TDA
Exemption
Documentation showing project (office, mixed-use,
residential, or retail) is located within a Transit Priority
Area or within 0.5 miles (800 meters) walking distance
of an existing or planned major transit stop.
AllOption 1.
Parking
Path 1. Reduce
Parking
Calculations demonstrating the percent reduction in
parking capacity from baseline.
AllOption 1.
Parking
Path 1. Reduce
Parking
Parking Plan or Site Plan showing the LEED boundary
and the parking used by the project.
AllOption 1.
Parking
Path 2. Parking
Fee
Narrative identifying the parking fees and explaining
how the rate charged is equal to or greater than the
local market rate for parking.
AllOption 1.
Parking
Path 2. Parking
Fee
Documentation confirming local market parking rate.

U.S. Green Building Council LEED v5 Reference Guide for Building Design and Construction, April 2025 Launch Edition 95