DOCUMENTATION
| Project types | Options | Paths | Documentation |
|---|---|---|---|
| All | Option 1. Electric Vehicle Supply Equipment | All | Site plan identifying all parking spaces the project, and all parking spaces with EVSE. |
| All | Option 1. Electric Vehicle Supply Equipment | All | Confirmation that the accessible parking space is at least 9 feet (2.5-meters) wide, has a five-foot (1.5- meters) access aisle, and has charging station accessibility features for use by people with mobility, ambulatory, and/or visual limitations. |
| All | Option 1. Electric Vehicle Supply Equipment | All | Calculation documenting the percentage of parking spaces with EVSE (including break-out for accessible parking spaces). |
| All | Option 1. Electric Vehicle Supply Equipment | All | Evidence that the EVSE meet all criteria identified in the credit requirements (e.g., product information from manufacturer or contract specification). |
| All | Option 2. Electric Vehicle Readiness | All | Site plan identifying all parking spaces used by the project and the total number of EV-ready spaces, including clear identification of at least 1 EVSE in an accessible parking space. |
| All | Option 2. Electric Vehicle Readiness | All | Calculation documenting the percentage of parking spaces that are EV-Ready. |
| All | Option 2. Electric Vehicle Readiness | All | Evidence that each EV-Ready parking space has the necessary electrical infrastructure to support the installation of an EV charger including a 40-amp panel capacity, dedicated 208/240V branch circuit, and conduit (raceway) with electrical wiring terminating at a receptacle or junction box for the parking space (e.g., contract documents). |
REFERENCED STANDARDS
U.S. Green Building Council LEED v5 Reference Guide for Building Design and Construction, April 2025 Launch Edition 102