855773644-LEED-v5-BD-C-Reference-Guide-Launch-Edition - Page 119

Extracted Content

using strategies that minimize disruptive activities and ensure removal efforts do not harm sensitive ecosystems. It is highly encouraged to consult with the local regulatory agency on best management practices (BMPs) for removal and control.

DOCUMENTATION
Project
types
OptionsPathsDocumentation
AllAllCompliance by
permit
Confirmation of whether the project site is at least one acre
and located in an area where the EPA is the NPDES permitting
authority (or EU Taxonomy).
AllAllCompliance by
local
equivalent
Confirmation that the local standard/code is equivalent to or
more stringent than the_2022 U.S. EPA CGP_ or_EU Taxonomy:_
DNSH, Pollution Prevention, Item 4 Noise and Dust.
AllAllCompliance by
local
equivalent
Name of the local standard/code being applied (if applicable)
AllAllAllThe project’s ESC plan.
AllAllAllThe project’s site assessment identifying any special-status
vegetation, healthy habitat, exclusion zones demarcated by
physical barriers, and invasive vegetation, invasive vegetation
removal/control plans.
AllAllAllEvidence that the project includes only native and adapted
vegetation that is not currently listed as invasive (e.g.,
landscape plan).
AllAllAllConfirmation that 100% of Special-Status vegetation located
on-site, as defined by local, state, or federal entities, is/will be
conserved.
REFERENCED STANDARDS

U.S. Green Building Council LEED v5 Reference Guide for Building Design and Construction, April 2025 Launch Edition 109