Snow removal plan and safe walking surfaces Developing a snow removal plan is important for establishing protocols before storms hit. Effective planning enhances safety and minimizes disruption to daily activities and infrastructure. Using appropriate road materials can significantly impact snow removal efficiency. Choosing materials that improve traction, such as sand, can reduce the risk of accidents during winter storms. Designating specific areas for the accumulation of snow and roof snow removal is essential. These areas should be strategically located to prevent the obstruction of roadways, sidewalks, and emergency access points and limit damage to trees and people. The plan can include scheduling regular inspections during winter months, providing guidelines for safely removing snow, and identifying qualified personnel or contractors to conduct the work.

Landscaping considerations Projects may include adapted plants and native species capable of withstanding significant weight, such as heavy snow loads, which may vary by location.

DOCUMENTATION
Project
types
OptionsPathsDocumentation
All

AllAllIdentification of the two hazards the site and site structures are
designed and constructed to meet.
All

DroughtAllConfirmation of whether the project includes any created water
features.
All

DroughtProjects
with
Water
Features
Evidence that the makeup water for the created water features
complies with_SITES C3.4_ (e.g., SITES certification and
scorecard or evidence that 50% of annual make-up water for site
water features comes from non-potable water sources or that
site water features only require a total of 10,000 gallons or fewer,
37,854.12 liters or fewer, of potable water annually).
All

Extreme
heat
AllEvidence of the two qualifying extreme heat resilience elements
included in the project (e.g., contract documents, massing and
orientation studies of the building, map to emergency cooling
station, product information from paving manufacturers or SR
values or open-grid pavement permeability).
All

FloodingAllEvidence that the project is certified under a qualifying flood-
resilient design standard (e.g., certificate/stamped drawings)
and/or evidence that critical utilities meet the design criteria
and/or confirm that all structural materials, finish materials, and
connectors used below DFE are flood resistant (e.g., contract
documents).
All

HailAllEvidence that the project site and site structures are designed
and constructed according to_FORTIFIED Commercial High_
Wind and Hail Specific Design Requirements for Hail(for
example, evidence of the_FORTIFIED_ + Hail certification).