Project
types
OptionsPathsDocumentation



Hurricanes
and high
winds
AllEvidence that the project site and site structures are designed
and constructed according to_FORTIFIED Commercial Wind_
standards (e.g., evidence of the_FORTIFIED_ certification).



Sea level
rise
AllEvidence of the two qualifying sea level rise resilience elements
included in the project (e.g., contract documents, product
information from manufacturers; meeting notes documenting
engagement in relevant community-level planning, partnerships,
and/or design workshops).



TsunamiAllEvidence the project has designated a tsunami danger area on
site and installed evacuation route signage and public Alert-
notified NOAA Weather Radio (NWR) receivers.



WildfireAllEvidence that the site and site structures are designed and
constructed in compliance with_SITES v2 Rating System Credit_
4.11: Reduce the risk of catastrophic wildfire (e.g., SITES
certification and scorecard or contract documents demonstrating
landscaping design practices in alignment with Firewise – Safer
from the Start: A Guide to Firewise-Friendly Developments,
Appendix E).



Winter
Storms
AllEvidence of the two qualifying winter storm resilience elements
included in the project (e.g., contract documents, snow-removal
operations and maintenance plan, product documentation from
manufacturers, planting information).