855773644-LEED-v5-BD-C-Reference-Guide-Launch-Edition - Page 192

Extracted Content

To use Table 6, the project must be connected to a municipal or district steam system that does not allow the return of steam condensate.

Table 6. Compliant municipal steam systems

Steam systemRequirement
Steam condensate disposalCool municipally supplied steam condensate (no return) to
drainage system with heat recovery system or reclaimed
water
OROR
Reclaim and use steam condensate100% recovery and reuse

AND/OR

Option 4. Outdoor Water Use (1–2 points)

PATH 1. NO IRRIGATION (2 POINTS)

Show that the landscape does not require a permanent irrigation system beyond a maximum two-year establishment period.

OR

PATH 2. EFFICIENT IRRIGATION (1–2 POINTS)

Reduce the project’s theoretical irrigation requirement (TIR) by at least 50% from the calculated baseline. Points are awarded according to Table 7.

Table 7. Points for reducing outdoor water use

Percentage reductionPoints
50%1
100%2

AND/OR

Option 5. Optimize Process Water Use (1–2 points)

PATH 1. LIMIT COOLING TOWER CYCLES (1–2 POINTS)

For cooling towers and evaporative condensers, conduct a one-time potable water analysis, measuring at least the five control parameters listed in Table 8.

Table 8. Maximum concentrations for parameters in condenser water

ParameterMaximum level
Ca (as CaCO3)600 ppm*
Total alkalinity500 ppm

U.S. Green Building Council LEED v5 Reference Guide for Building Design and Construction, April 2025 Launch Edition 182