To use Table 6, the project must be connected to a municipal or district steam system that does not allow the return of steam condensate.
Table 6. Compliant municipal steam systems
| Steam system | Requirement |
|---|---|
| Steam condensate disposal | Cool municipally supplied steam condensate (no return) to drainage system with heat recovery system or reclaimed water |
| OR | OR |
| Reclaim and use steam condensate | 100% recovery and reuse |
AND/OR
Option 4. Outdoor Water Use (1–2 points)
PATH 1. NO IRRIGATION (2 POINTS)
Show that the landscape does not require a permanent irrigation system beyond a maximum two-year establishment period.
OR
PATH 2. EFFICIENT IRRIGATION (1–2 POINTS)
Reduce the project’s theoretical irrigation requirement (TIR) by at least 50% from the calculated baseline. Points are awarded according to Table 7.
Table 7. Points for reducing outdoor water use
| Percentage reduction | Points |
|---|---|
| 50% | 1 |
| 100% | 2 |
AND/OR
Option 5. Optimize Process Water Use (1–2 points)
PATH 1. LIMIT COOLING TOWER CYCLES (1–2 POINTS)
For cooling towers and evaporative condensers, conduct a one-time potable water analysis, measuring at least the five control parameters listed in Table 8.
Table 8. Maximum concentrations for parameters in condenser water
| Parameter | Maximum level |
|---|---|
| Ca (as CaCO3) | 600 ppm* |
| Total alkalinity | 500 ppm |