REQUIREMENTS: CORE AND SHELL
Achievement pathwaysPoints
Core and Shell1–7
Option 1. Whole-Project Water Use1–7
OR
Option 2. Fixtures and Fittings–Calculated Reduction1–3
AND/OR
Option 3. Appliances and Process Water1–2
AND/OR
Option 4. Outdoor Water Use1–3
Path 1. No Irrigation3
OR
Path 2. Efficient Irrigation1–3
AND/OR
Option 5. Optimize Process Water Use1–3
Path 1. Limit Cooling Tower Cycles1–3
OR
Path 2. Optimize Water Use for Cooling1–3
OR
Path 3. Process Water Use1–2
AND/OR
Option 6. Water Reuse1–2
Path 1. Reuse-Ready System1
OR
Path 2. Alternative Water Sources2

Implement a combination of the strategies below for a maximum of 7 points. Projects may either attempt Option 1 or any combination of Options 2–6 below.

Option 1. Whole-project Water Use (1–7 points)

To pursue this pathway, project teams must develop a water use baseline and create a proposed use model. Points are achieved based on reductions from the baseline in Table 11.

Table 11. Points for reducing overall project water use

Percent reductionPointsTotal points for
alternative water
30%12
35%23
40%34
45%45
50%56
55%67
60%7