855773644-LEED-v5-BD-C-Reference-Guide-Launch-Edition - Page 208

Extracted Content

Project
types
Col2OptionsPathsDocumentation
Option 2.
Fixtures and
Fittings
Option 2.
Fixtures and
Fittings
Contract documents showing the project’s alternative
water system details, location, and capacity.
Option 3.
Appliance
and Process
Water
Option 3.
Appliance
and Process
Water
AllContract document(s) specifying the project’s newly
installed commercial washing machines, commercial
food waste disposers, commercial laboratory and
medical equipment, and/or municipal steam systems
and process water equipment, as applicable, including
performance specifications.
Option 5.
Optimize
Process
Water Use
Option 5.
Optimize
Process
Water Use
Path 1. Limit
Cooling
Tower
Cycles
Results from the potable water analysis for cooling
towers and evaporative condensers. Include the
concentration levels for all five parameters listed in
Table 8 of the Rating System.
Option 5.
Optimize
Process
Water Use
Option 5.
Optimize
Process
Water Use
Path 2.
Optimize
Process
Water Use
Equipment schedule indicating cooling tower type.
Option 5.
Optimize
Process
Water Use
Option 5.
Optimize
Process
Water Use
Path 2.
Optimize
Process
Water Use
Calculation shows the baseline process water use.
Option 5.
Optimize
Process
Water Use
Option 5.
Optimize
Process
Water Use
Path 2.
Optimize
Process
Water Use
Calculation shows the design process, water use,
including any alternative water savings.
Option 5.
Optimize
Process
Water Use
Option 5.
Optimize
Process
Water Use
Path 3.
Process
Water Use
Total % of processed water use in building.
Option 5.
Optimize
Process
Water Use
Option 5.
Optimize
Process
Water Use
Path 3.
Process
Water Use
Description of systems included in the project that
accounts for more than 10% of the total building
regulated water use (excluding cooling water).
Option 5.
Optimize
Process
Water Use
Option 5.
Optimize
Process
Water Use
Path 3.
Process
Water Use
Calculation shows the baseline process of water use.
Option 5.
Optimize
Process
Water Use
Option 5.
Optimize
Process
Water Use
Path 3.
Process
Water Use
Calculation showing the design process water use,
including any alternative water savings.
Option 6.
Water Reuse
Option 6.
Water Reuse
Path 1.
Reuse-
ready
System
Contract documents identify with the space provided
for future treatment equipment.
Option 6.
Water Reuse
Option 6.
Water Reuse
Path 2.
Alternative
Water
Source
Identification of the alternative water source (onsite
water reuse system or municipally supplied reclaimed
water).
Option 6.
Water Reuse
Option 6.
Water Reuse
Path 2.
Alternative
Water
Source
Identification of which eligible end-use(s) the water
reuse system meets the needs (irrigation, flush
fixtures, makeup water systems, such as cooling
towers or boilers, or other process water demand).
Option 6.
Water Reuse
Option 6.
Water Reuse
Path 2.
Alternative
Water
Source
Contract documents highlighting the details of the
alternative water source system(s) details.
REFERENCED STANDARDS

U.S. Green Building Council LEED v5 Reference Guide for Building Design and Construction, April 2025 Launch Edition 198