o Review/witness performance testing.

o Attend milestone meetings at 50% and 100% completion.

o Review sampling of QA/QC documentation (checklist and tests).

o Track identified issues to resolution (Issues/Resolution Log).

o Develop a preliminary commissioning report.

  • Occupancy/Operations Phase

o Review training program.

o Develop final commissioning report.

o Develop or review the ongoing Cx plan.

Comparison of Fundamental EAp3: Fundamental Commissioning and EAc5: Enhanced Commissioning

Table 1 for MEP systems and Table 2 for the Building Envelope provide a detailed comparison of key tasks and milestones for EAp3: Fundamental Commissioning and EAc5: Enhanced Commissioning .

Table 1. MEP System Tasks for EAp3: Fundamental Commissioning and EAc5: Enhanced Commissioning

PhaseTask DescriptionsFundamental
ASHRAE
90.1-2019
Enhanced
ASHRAE
202-2018
Minimum
Requirements as
listed
Identification of CxPSection
4.2.5.2, with
timing required
by LEED
Section 5.1.1,
with timing
required by
LEED
Fundamental: By
the end of design
development
phase.

Enhanced: During
predesign or very
early in the design
phase.
Predesign

For CxP engaged
later than
predesign, tasks
must be completed
immediately upon
CxP engagement.
Assist in
Development/Revie
w and Update
Owner’s Project
Requirements
(OPR) to include
HVAC, Service
Water Heating,
Power, Lighting and
Other Equipment
Required by
LEED
Section 6.2,
6.3
Enhanced: OPR
shall list and define
the systems and
assemblies to be
commissioned,
including sampling
strategies accepted
by the Owner. It
should clearly
define objectives,
Cx scope and
requirements and
identify the number,
format and