PhaseTask DescriptionsFundamental
ASHRAE
90.1-2019
Enhanced
ASHRAE
202-2018
Minimum
Requirements as
listed
scheduling of
design and
submittal reviews.
Develop Cx PlanSection
4.2.5.2.1
Section
4.2.5.2.2
Section 7.2,
7.3
Fundamental and
Enhanced:
Development of Cx
Plan.

Enhanced: Update
Cx plan at least
once per phase
(DD, CD,
Construction).
Design PhaseReview Basis of
Design (BOD)
Required by
LEED
Section 8.2,
8.3
Enhanced: Review
BOD for compliance
with OPR.
Design PhaseUpdate Cx PlanNot RequiredSection 7.2,
7.3
Enhanced: Update
Cx plan at least
once per phase
(DD, CD,
Construction).
Design PhaseDevelop Cx
Specification
Section
4.2.5.1.1,
4.2.5.2.1,
6.9.2
Section 9.2,
9.3
Design PhaseDesign Document
Reviews (Design
Drawings and
Specifications)
Section
4.2.5.2,
4.2.5.2.2
Section 10.2,
10.3
Full Drawing and
Specification
Review for systems
to be
commissioned.

Fundamental and
Enhanced: detail
compliance with the
OPR and provisions
in respective
standards.

Each design review
to include issues
log for
tracking/resolution
of issues.

Enhanced: Back-
check review to
confirm if
recommendations

U.S. Green Building Council LEED v5 Reference Guide for Building Design and Construction, April 2025 Launch Edition 238