855773644-LEED-v5-BD-C-Reference-Guide-Launch-Edition - Page 252

Extracted Content

PhaseTask DescriptionsFundamental
ASHRAE
90.1-2019
Enhanced
ASHRAE
202-2018
Minimum
Requirements as
listed
Operations and
Maintenance
Manual
Not RequiredRequired for
LEED
Enhanced:
Compile an
Operations and
Maintenance
Manual from
contractor
submissions.
Preliminary
Commissioning
Report
4.2.5.1.2,
4.2.5.2.2
Section 17.2.1Fundamental and
Enhanced:
Completion of
LEED Online
documentation as
well as report
summarizing Cx
activities to end of
Construction
Phase, Including
OPR, Cx Plan and
reports.
Occupancy/Operati
ons Phase
Review Training
Program**-**
4.5.2.2.2.c.5Section 15.2,
15.3
Fundamental:
Review the training
plan.

**Enhanced:**Review
the training plan
and confirm that it
has been
implemented.
Include training plan
in the Systems
Manual.
Occupancy/Operati
ons Phase
Post-Occupancy
Review
Not RequiredSection 16.2,
16.3
Enhanced:
Conduct minimum
of one in person,
post occupancy site
visit with Facility
Maintenance staff
(or similar) prior to
end of the warranty
period.
Occupancy/Operati
ons Phase
Final
Commissioning
Report
4.2.5.2.2Section 17.2.3Full report
summarizing Cx
activities, including
Occupancy Phase
activities.
Occupancy/Operati
ons Phase
On-going Cx PlanRequired for
LEED
Required for
LEED
Fundamental and
**Enhanced:**Provide
an ongoing Cx plan
that allows building
operators to
maintain a

U.S. Green Building Council LEED v5 Reference Guide for Building Design and Construction, April 2025 Launch Edition 242