PhaseTask DescriptionsFundamental
ASHRAE
90.1-2019
Enhanced
ASTM E2947-
2021
Minimum
Requirements as
listed
Field ReviewsSection
4.2.5.2.2.c.3
Section 9.3.1Fundamental:
Minimum of one (1)
per envelope
assembly type.

Enhanced: should
include more
regularly scheduled
/periodic site
reviews with a focus
on early reviews
(approx. 10% of
installation).
Testing
(Review/witness
performance
testing)
Section
4.2.5.2.2.c.3
Section 9.3.1Fundamental: N/A

Enhanced:
Witnessing a
sampling of
envelope tests. May
also include
laboratory and
mockup testing.
MeetingsRequired by
LEED
Section 9.3.4Fundamental:
Milestone meetings
at 50% and 100%.

Enhanced:
Additional milestone
meetings (i.e., 25%,
50%, 75% and
100% of envelope
schedule minimum).
QA/QC
Documentation
(contractor’s
checklists)
Required by
LEED
Section 9.2.2Fundamental:
Sampling review of
building envelope
contractor
checklists (i.e.,
10%).

Enhanced: Review
a minimum of 25%
sampling of installer
checklists.
Operations and
Maintenance
Manual
Not RequiredSection 9.4Confirm compliance
with OPR, BOD and
BECx Plan.
Construction Phase
BECx Report
Section
4.2.5.2.2.c
Section 9.7Fundamental and
Enhanced:
Completion of
LEED Online
documentation as

U.S. Green Building Council LEED v5 Reference Guide for Building Design and Construction, April 2025 Launch Edition 246