DESIGN REVIEW FOR CORE AND SHELL PROJECTS

During the design reviews, include review comments on LEED BD+C: Core and Shell systems and how any incomplete system can meet ASHRAE Standard 90.1 requirements for tenant fitouts. This includes both energy efficiency measures and tenant metering requirements.

FINAL COMMISSIONING REPORT

Along with the required elements listed in the Final Commissioning Report section above, identify and defer any tests until base building systems connect with future tenant equipment (e.g., a central VAV air handling unit with controls testing that must be deferred until after installing tenant VAV terminal equipment).

TENANT GUIDELINES FOR COMMISSIONING

IPp4: Tenant Guidelines allow owners to inform all tenants of the building’s sustainable design and construction features. Project teams are encouraged to include a section on commissioning addressing any interconnection between base building and tenant-installed systems.

DOCUMENTATION
Project
types
OptionsDocumentation
AllAllIf the report is a draft, include a plan for the completion of
commissioning and training, including climatic and other conditions
required for performance of any deferred tests.
AllAllConfirmation of compliance with_ANSI/ASHRAE/IES Standard 90.1_
commissioning requirements for building systems, controls, and the
building envelope (Section 4.2.5.2 exceptions shall not apply).
AllAllConfirmation of design phase meeting.
AllAllProvide Commissioning Plan and sample FPT Test scripts (one sample
per discipline).
AllAllOwner’s Project Requirements and BOD
AllAllIdentification of Commissioning Provider including key personnel (CxP)
and Verification and Testing (V&T) providers (as applicable).
AllAllQualifications of CxP and V&T providers.
AllAllOngoing Cx Plan (post-occupancy).
AllAllConfirmation of construction phase milestone meetings at 50% and
100% completion.
AllAllConfirmation that submittals were reviewed and at least 10% of the
contractor’s documents were QA/QC’d