855773644-LEED-v5-BD-C-Reference-Guide-Launch-Edition - Page 295

Extracted Content

Exceptions to Platinum requirements, such as for renewable fuels, may be included in the Project Priorities Library.

DOCUMENTATION
Project
types
OptionsPathsDocumentation
New
Construction
and Core and
Shell
AllDocumentation of all heating, service water heating, solar
water heating, and process heating equipment within the
project. Include information on the energy source,
equipment quantity, and the capacity and efficiency for
each piece of equipment (equipment cutsheets or
schedules).
New
Construction
and Core and
Shell
AllDescription of emergency support and on-site generation
equipment, including how it is used on site. Include an
estimated annual run-time for any combustion equipment.
New
Construction
and Core and
Shell
AllDocument emergency support systems and on-site
generation equipment including system type, fuel source,
and capacity.
New
Construction
and Core and
Shell
AllDocumentation that the project is subject to local code
that requires full electrification down to 20 deg F or lower.
Provide relevant code language and applicability (if
applicable).
New
Construction
and Core and
Shell
AllWeighted average COP calculation, as applicable for
SWH and Space heating. Projects may determine
weighted average COP using a streamlined method,
rated capacities, or energy simulation.
New
Construction
and Core and
Shell
Option 1Narrative or Mechanical drawings showing that systems
used for heating, SHW, and cooking and other process
loads are not fueled by onsite combustion.
New
Construction
Option 2AllSequence of Operations for hybrid electric/non-electric
systems and evidence that electric equipment (electric
mode) can meet space heating, SHW, and process
heating loads >20F (as applicable). Evidence may
include equipment capacities and accompanying design
load calculations, or energy simulation reports, or other.
New
Construction
Option 2AllFor projects attempting no on-site combustion except at
low temperatures, document how the applicable systems
can operate without on-site combustion at outside air
temperatures above 20°F (-6.5 °C).
New
Construction
Option 2Path 1
Total building space heating load at OA Temp 20*F or
below.
New
Construction
Option 2Path 1
Provide a description of the basis of analysis for space
heating loads.
New
Construction
Option 2Path 1
Sequence of operations for all space heating equipment.
New
Construction
Option 2Path 2Sequence of operations for all service water heating
equipment.
New
Construction
Option 2Path 2Sequence of operations for all solar water heating
equipment.

U.S. Green Building Council LEED v5 Reference Guide for Building Design and Construction, April 2025 Launch Edition 285