| EAp2: Minimum Energy Efficiency | Linked EAc3: Enhanced Energy Efficiency (choose Option 1 OR Option 2) | Available points | Col4 |
|---|---|---|---|
| EAp2: Minimum Energy **Efficiency ** | Linked****EAc3: Enhanced Energy Efficiency (choose Option 1 OR Option 2) | New Construction | Core and Shell |
| Option 2. ASHRAE 90.1-2022, Prescriptive Method | Option 1. Prescriptive Path | 1–10 | 1–7 |
| Option 2. ASHRAE 90.1-2022, Prescriptive Method | Path 1. Regulated Loads, Case 2.ASHRAE 90.1-2022. 4 New Construction or 2 Core and Shell points automatically rewarded for prerequisite compliance. Up to 3 additional points to implement incremental efficiency measures for HVAC, service water heating, lighting, and/or building mass with night flush per_ASHRAE 90.1-2022_, Section 11. | 4–7 | 2–6 |
| Option 2. ASHRAE 90.1-2022, Prescriptive Method | AND/OR | + | + |
| Option 2. ASHRAE 90.1-2022, Prescriptive Method | Path 2. Plug and Process Loads | 1–4 | 1–3 |
| Option 1 or Option 2. 90.1-2019 or 90.1- 2022 Energy Cost Budget Method (ECB) | Option 1. Prescriptive Path Path 2. Plug and Process Loads | 1–4 | 1–3 |
| New Construction and Core and Shell Option 1. ASHRAE 90.1-2019: and New Construction Option 2.ASHRAE 90.1- 2022, Appendix G Performance Rating Method (PRM) | Option 2. Energy Simulation Implement efficiency measures to achieve a percentage reduction in future source energy below a performance Index Target (PIt) referenced to_ASHRAE 90.1-2019_ equivalent performance. | 1–10 | 1–7 |
| Core and Shell Option 2 ASHRAE 90.1-2022, Appendix G Performance Rating Method (PRM) | Option 2. Energy Simulation Implement efficiency measures to achieve a percentage reduction in future source energy below a performance Index Target (PIt) referenced to_ASHRAE 90.1-2022_ equivalent performance. 2-3 points automatically rewarded for future source energy that minimally complies with ASHRAE 90.1-2022 (0% reduction). | 2–7 |
Option 1. Prescriptive Path
Option 1. Prescriptive Path rewards improved efficiency for regulated loads under Path 1 and for plug and process loads under Path 2, with points weighted for each path based on the typical distribution of regulated versus plug and process loads in buildings. Combined points for Paths 1 and 2 cannot exceed 10 for LEED BD+C: New Construction, or seven for LEED BD+C: Core and Shell.
U.S. Green Building Council LEED v5 Reference Guide for Building Design and Construction, April 2025 Launch Edition 313