Combined Heat and Power To limit undue credit for site-recovered energy from Combined Heat and Power (CHP) with onsite combustion emissions, projects must model CHP systems using one of the following methods instead of ASHRAE 90.1 G2.4.2.1:
-
CHP in baseline and proposed . Model CHP systems including all fuel inputs and associated site-recovered energy identically in the baseline design and the proposed design.
-
Purchased electricity in baseline and proposed . Model purchased electricity instead of the on-site electricity generation. Either credit site-recovered energy from the CHP towards the thermal loads for the baseline and proposed design identically or ignore the site-recovered energy contribution in the baseline and proposed design).
-
CHP in proposed; purchased electricity in baseline . Model CHP systems including all fuel inputs and associated site-recovered energy in the proposed design. Model the baseline design per ASHRAE 90.1 with purchased electricity and with no credit for siterecovered energy.
DOCUMENTATION
| Project types | Options | Paths | Documentation |
|---|---|---|---|
| New Construction and Core and Shell | Option 1 | Path 1: Case 1 and 2 | Demonstrate compliance with_EAp2: Minimum Energy_ Efficiency. |
| New Construction and Core and Shell | Option 1 | Path 1: Case 1 and 2 | List options showing prescriptive compliance with ASHRAE 90.1 2019. |
| New Construction and Core and Shell | Option 1 | Path 2: Case 1 | IT department policies for plug load controls. |
| New Construction and Core and Shell | Option 1 | Path 2: Case 1 | Evidence of a plug load dashboard accessible to all regular occupants of the building (specifications, photos, screenshots, etc.) |
| New Construction and Core and Shell | Option 1 | Path 2: Case 2 | Provide documentation demonstrating the_ISO 25745_ rating for people conveyance equipment (as applicable). |
| New Construction and Core and Shell | Option 1 | Path 2: Case 2 | Provide the design ELC calculation following methods in Informative Appendix C, and calculation for the percentage of reduction from_ASHRAE 90.4-2022_ maximum design electrical loss (as applicable). |
| New Construction and Core and Shell | Option 1 | Path 2: Case 2 | Provide refrigeration equipment cut-sheets (as applicable). |
| New Construction and Core and Shell | Option 1 | Path 2: Case 2 | Provide refrigerated warehouse design documents to verify compliance with_California Title 24-2022 Section_ 120.6 (as applicable). |
| New Construction and Core and Shell | Option 1 | Path 2: Case 2 | Provide documentation for the Baggage Handling Equipment Individual Carrier System, such as specifications or cut sheets, to verify the installation of variable frequency drives (as applicable). |