Option 2Path 1.
MBCx –
Basic
Software
Documentation of owner commitment to at least three
years of MBCx for the building and identification of key
individual(s) responsible for MBCx (contract, letter
signed by owner, job descriptions or other evidence)
Option 2Path 1.
MBCx –
Basic
Software
MBCx Plan
Option 2Path 1.
MBCx –
Basic
Software
Narrative describing the EIS, including functionality,
accessibility, and sample graphics. Identify systems
included in the MBCx plan
Option 2Path 2.
MBCx –
Enhanced
EIS
Narrative describing the EIS, including functionality,
accessibility, and sample graphics. Identify systems
included in the MBCx plan. As applicable, confirm
compliance with_ASHRAE 90.1 Section 8.4.3_ or
additional functionality of EIS.
Option 2Path 2.
MBCx –
Enhanced
Software
Schedules, drawings, or other documentation confirming
FDD devices installed in the system and verification that
60% threshold is met for systems exceeding 600 tons
Option 2Path 2.
MBCx –
Enhanced
Software
Narrative describing the FDD system functionality,
accessibility, and sample graphics, reports or trends from
the system.
Core and
Shell
OptionPath 1.
Enhanced
Cx for MEP
Systems
Confirmation of all construction phase milestone
meetings