855773644-LEED-v5-BD-C-Reference-Guide-Launch-Edition - Page 379

Extracted Content

Energy and Atmosphere Credit

GRID INTERACTIVE

EAc6 New Construction (1–2 points) Core and Shell (1–2 points)

INTENT

To enhance power resilience and position buildings as active partners contributing to grid decarbonization, reliability, and power affordability through integrated management of building loads in response to variable grid conditions.

REQUIREMENTS
Achievement pathwaysPoints
New Construction and Core and Shell1–2
Option 1. Energy Storage1–2
AND/OR
Option 2. Demand Response Program1
AND/OR
Option 3. Automated Demand-Side Management1
Path 1. System-Level Controls1
OR
Path 2. Building Automation System1
Option 4. Power Resilience1

All projects must evaluate grid-interactive measures concerning the current and forecasted grid context, location, building type, and ownership structure and account for the results in decisionmaking.

Interval recording meters and equipment capable of accepting an external signal must also be provided.

Option 1. Energy Storage (1–2 points)

Provide on-site electric storage and/or thermal storage meeting the criteria in Table 1.

Include automatic load management controls capable of storing the electric or thermal energy during off-peak periods or periods with low grid carbon intensity and using stored energy during on-peak periods or periods of high grid carbon intensity.

U.S. Green Building Council LEED v5 Reference Guide for Building Design and Construction, April 2025 Launch Edition 369