Table 1. Peak storage capacity relative to peak demand

Storage1 Point2 Points
Electric Storage Capacity
Relative to peak electric demand
0.2 kWh/kW0.4 kWh/kW
Thermal Storage Capacity
Relative to peak coincident thermal demand (heating
+ cooling + service water heating + process heat)
1.0 kWh/kW
or Btu/Btu/hr
or ton-hrs/ton
2.0 kWh/kW
or Btu/Btu/hr
or ton-hrs/ton

AND/OR

Option 2. Demand Response Program (1 point)

Enroll in a minimum one-year demand response (DR) contract with a qualified DR program provider, with the intention of multiyear renewal.

On-site electricity generation and fuel combustion cannot be used to meet the demand-side management criteria.

AND/OR

Option 3. Automated Demand-side Management (1 point)

On-site electricity generation and fuel combustion cannot be used to meet the demand-side management criteria.

PATH 1. SYSTEM-LEVEL CONTROLS (1 POINT)

Provide automated demand response controls for at least two of the following systems installed within the project scope of work:

  • HVAC systems (50% of rated capacity)

  • Lighting systems (50% of power)

  • Automatic receptacle controls

  • Service water heating (90% of capacity)

  • Electric vehicle supply equipment

OR

PATH 2. BUILDING AUTOMATION SYSTEM (1 POINT)

Develop a plan for shedding at least 10% of the project’s peak electricity demand for a minimum of one hour. The plan must address both winter and summer peaks considering electrified grid projections.

U.S. Green Building Council LEED v5 Reference Guide for Building Design and Construction, April 2025 Launch Edition 370