855773644-LEED-v5-BD-C-Reference-Guide-Launch-Edition - Page 387
Extracted Content
DOCUMENTATION
| Project types | Options | Paths | Documentation |
|---|---|---|---|
| All | All | All | Description of the grid interactive measures evaluated and the relevant context (e.g., forecasted grid conditions, project location, building type, ownership structure, and other relevant factors), and confirmation that the results have been accounted for in decision-making. |
| All | All | All | Confirmation the project has interval recording meters and equipment capable of accepting an external signal. |
| All | All | All | Documentation that the technology and controls in place for energy storage, demand response, automated demand- side management, and power resiliency, as applicable, are within the CxP scope of work. |
| All | All | All | Affirmation that the technology and controls in place for energy storage, demand response, automated demand- side management, and power resiliency, as applicable, are documented in the project systems manual, or Current Facilities Requirements (CFR) and Operations and Maintenance (OM) plan. |
| All | Option 1 | Calculation showcasing achievement of point threshold. (Estimated Energy use, Peak Demand, Storage Capacity, Peak Storage Capacity Relative to Peak Demand). | |
| All | Option 1 | Narrative documenting the automatic load management controls. | |
| All | Option 2 | Proof of enrollment in demand response program. | |
| All | Option 3 | Path 1 | Identification of systems with automatic demand response controls and calculation showing required thresholds have been met. |
| All | Option 3 | Path 2 | Project total peak electricity demand and total percentage of load included in the load shedding program. |
| All | Option 3 | Path 2 | Description of how the project will shed 10% of the peak demand for one hour and what triggers the event. (Examples include short narrative, Sequence of Operations, etc.). |
| All | Option 4 | Define and give examples of critical equipment that requires continuous operation. Provide evidence of controls capable of meeting power resiliency | |
| All | Option 4 | Narrative describing the on-site renewable and energy storage system design and operation, and calculation to demonstrate islanding capabilities for the critical infrastructure for at least three days. | |
| Core and Shell | Option 3 | Path 1 and Path 2 | Tenant Lease Agreement showing the inclusion of automatic demand response control within their scope of work. |
| Core and Shell | Option 3 | Path 1. System Level Controls | Building systems manual, or Current Facilities Requirements and O&M plan that address the technology and controls in place for Automated Demand Response System-Level controls. |
U.S. Green Building Council LEED v5 Reference Guide for Building Design and Construction, April 2025 Launch Edition 377