855773644-LEED-v5-BD-C-Reference-Guide-Launch-Edition - Page 387

Extracted Content

DOCUMENTATION
Project
types
OptionsPathsDocumentation
All
AllAllDescription of the grid interactive measures evaluated and
the relevant context (e.g., forecasted grid conditions,
project location, building type, ownership structure, and
other relevant factors), and confirmation that the results
have been accounted for in decision-making.
All
AllAllConfirmation the project has interval recording meters and
equipment capable of accepting an external signal.
All
AllAllDocumentation that the technology and controls in place for
energy storage, demand response, automated demand-
side management, and power resiliency, as applicable, are
within the CxP scope of work.
All
AllAllAffirmation that the technology and controls in place for
energy storage, demand response, automated demand-
side management, and power resiliency, as applicable, are
documented in the project systems manual, or Current
Facilities Requirements (CFR) and Operations and
Maintenance (OM) plan.
All
Option 1Calculation showcasing achievement of point threshold.
(Estimated Energy use, Peak Demand, Storage Capacity,
Peak Storage Capacity Relative to Peak Demand).
All
Option 1Narrative documenting the automatic load management
controls.
All
Option 2Proof of enrollment in demand response program.
All
Option 3
Path 1Identification of systems with automatic demand response
controls and calculation showing required thresholds have
been met.
All
Option 3
Path 2
Project total peak electricity demand and total percentage
of load included in the load shedding program.
All
Option 3
Path 2
Description of how the project will shed 10% of the peak
demand for one hour and what triggers the event.
(Examples include short narrative, Sequence of
Operations, etc.).
All
Option 4Define and give examples of critical equipment that
requires continuous operation. Provide evidence of controls
capable of meeting power resiliency
All
Option 4Narrative describing the on-site renewable and energy
storage system design and operation, and calculation to
demonstrate islanding capabilities for the critical
infrastructure for at least three days.
Core and
Shell
Option 3Path 1 and
Path 2
Tenant Lease Agreement showing the inclusion of
automatic demand response control within their scope of
work.
Core and
Shell
Option 3Path 1.
System
Level
Controls
Building systems manual, or Current Facilities
Requirements and O&M plan that address the technology
and controls in place for Automated Demand Response
System-Level controls.

U.S. Green Building Council LEED v5 Reference Guide for Building Design and Construction, April 2025 Launch Edition 377