855773644-LEED-v5-BD-C-Reference-Guide-Launch-Edition - Page 401
Extracted Content

Materials and Resources Prerequisite
PLANNING FOR ZERO WASTE OPERATIONS
MRp1
REQUIRED
New Construction Core and Shell
INTENT
To reduce the amount of waste that is generated by building occupants and hauled to and disposed of in landfills and incinerators through reduction, reuse, and recycling services and education, and to conserve natural resources for future generations. To set the building up for success in pursuing zero waste operations.
REQUIREMENTS
| Achievement pathways | Points |
|---|---|
| New Construction and Core and Shell | N/A |
| Storage and Collection of Recyclables | |
| AND | AND |
| Zero Waste Operations Planning | Zero Waste Operations Planning |
Comply with the following requirements:
Storage and Collection of Recyclables
Provide dedicated areas accessible to waste haulers, janitorial staff, and building occupants for the collection and storage of recyclable materials for the entire building.
-
Collection and storage areas may be separate locations.
-
Recyclable materials must include organics/food waste, mixed paper, corrugated cardboard, glass, plastics, and metals.
o Mixed recyclables are acceptable for paper, corrugated cardboard, glass, plastics,
and metals if required by local conditions.
o Space for the storage of organics/food waste recycling is required even if service is
not available at the time of building occupancy.
- Take appropriate measures for the safe collection, storage, and disposal of batteries, mercury-containing lamps, and electronic waste.
U.S. Green Building Council LEED v5 Reference Guide for Building Design and Construction, April 2025 Launch Edition 391