855773644-LEED-v5-BD-C-Reference-Guide-Launch-Edition - Page 428
Extracted Content
PATH 2. TRACK ALL FUEL AND UTILITY USAGE FOR CONTRACTOR AND SUBCONTRACTOR JOBSITE OPERATIONS
See Path 1. for fuel and utility usage for contractor jobsite operations. Path 2 additionally requires that subcontractors also track their fuel and utility usage, including equipment operation and specific tasks. This can include fuel used to transport materials to or from the jobsite.
U.S. Green Building Council LEED v5 Reference Guide for Building Design and Construction, April 2025 Launch Edition 418