855773644-LEED-v5-BD-C-Reference-Guide-Launch-Edition - Page 460
Extracted Content
DOCUMENTATION
| Project types | Options | Paths | Documentation |
|---|---|---|---|
| All | Construction and Demolition Materials Management Plan | All | Provide the Construction and Demolition Materials Management Plan. |
| All | Diversion | Diversion | Provide the C&D Waste Diversion calculator. |
| All | Diversion | Diversion | Summary of waste tickets and confirmation that the numbers reported correspond to all the tickets for the project. |
| All | Diversion | Diversion | Confirmation that ADC is excluded from diverted waste calculations (but is included in total construction and demolition waste generated calculations). |
| All | Diversion | Diversion | Upload documentation with the facility average diversion rate of any mixed C&D materials sent to a processing facility. For those projects sending mixed C&D materials to a processing facility that has third party verified recycling rates, include proof of the third-party recycling rate and facility certification through an approved program. |
REFERENCED STANDARDS
-
EPA volume to weight conversion factors (epa.gov/smm/volume-weight-conversion-factors- solid-waste)
-
TRUE diversion criteria (true.gbci.org/true-diversion-data-additional-guidance)
U.S. Green Building Council LEED v5 Reference Guide for Building Design and Construction, April 2025 Launch Edition 450