855773644-LEED-v5-BD-C-Reference-Guide-Launch-Edition - Page 481

Extracted Content

DOCUMENTATION
Project
types
OptionsCol3PathsDocumentation
AllAllAllAllResults of regional and local air quality investigation, at
minimum, date and time of observations, a description of
the site, observed odors or irritants, and conclusions
regarding acceptability of the outdoor air quality.
AllAllAllAllIndication of whether the building is in an area where the
national guideline is exceeded (outdoor air treatment is
required per_ASHRAE 62.1-2022_, Section 6.1.4).
AllAllAllAllCalculation documents for mechanical ventilation (VRP),
natural ventilation (NVP) and IAQ procedure (IAQP).
AllAllAllAllAir cleaning systems (if used): supporting documentation
for safety and effectiveness.
AllAllAllAllIAQ Procedure: Air Quality Test Plan and Occupant Survey
Methodology.
AllAllAllAllIAQ Procedure: Completed air quality testing report
including time, date, testing methods complying with credit
requirements, results and limits of the tested contaminants
in all locations, and lab accreditation scope for VOCs.
AllAllAllAllIAQ Procedure: Subjective Occupant Evaluation Results.
AllAllAllAllFloor plans or photos of entryway systems.
AllAllAllAllDesign documents confirming filter grade and
implementation.
AllAllAllAllControl diagrams showing outdoor air measurement
devices (where required).
AllAllAllAllConfirmation the outdoor air measurement devices
measures airflow rates.
ResidentialResidentialAllAllConfirmation there are CO monitors in all units.
ResidentialResidentialAllAllDescription of how each system complies with_ASHRAE_
62.2-2022.
REFERENCED STANDARDS

U.S. Green Building Council LEED v5 Reference Guide for Building Design and Construction, April 2025 Launch Edition 471