Indoor Environmental Quality Credit

AIR QUALITY TESTING AND MONITORING

EQc5

New Construction (1–2 points)

INTENT

To support better management of indoor air quality (IAQ) and identify opportunities for healthbased approaches to building operations.

REQUIREMENTS
Achievement pathwaysPoints
New Construction1–2
Option 1. Preoccupancy Air Testing1–2
Path 1. Particulate Matter and Inorganic Gases1
AND/OR
Path 2. Volatile Organic Compounds1
AND/OR
Option 2. Continuous Indoor Air Monitoring1

Option 1. Preoccupancy Air Testing (1–2 points)

After construction ends and before occupancy, but under ventilation conditions typical for occupancy, conduct baseline IAQ testing. Retail projects may conduct the testing within 14 days of occupancy. The number of measurements should be specified according to Table 1 and taken in representative locations of the building.

Table 1. Number of measurements required for preoccupancy air testing

Total occupied floor area, sq. ft. (sq. m.)Number of measurements
≤ 5,000 (500)1
> 5,000 (500) and ≤ 15,000 (1,500)2
> 15,000 (1,500) and ≤ 25,000 (2,500)3
> 25,000 (2,500) and ≤ 200,000 (20,000)4 plus 1 additional measurement per each
25,000 sq. ft. (2,500 sq. m.) above 25,000 sq. ft.
> 200,00010 plus 1 additional measurement per each
50,000 sq. ft. (4600 sq. m.) above 200,000 sq. ft.

PATH 1. PARTICULATE MATTER AND INORGANIC GASES (1 POINT)

Test for the particulate matter (PM) and inorganic gases listed in Table 2 using an allowed test method and demonstrate that the contaminants do not exceed the concentration limits listed in

U.S. Green Building Council LEED v5 Reference Guide for Building Design and Construction, April 2025 Launch Edition 521