855773667-LEED-v5-O-M-Reference-Guide-Launch-Edition-1 - Page 109

Extracted Content

DOCUMENTATION
Project
types
OptionsPathsDocumentation

All
AllAllIdentification of two or more water subsystems that are
metered

All
AllAll
Confirmation water meters (including whole-building meters)
are recorded at least weekly and used to regularly analyze
time trends

All
AllAll
Narrative describing the time trend analysis process and how
the information is used at the project

All
AllAll
Confirmation meters are calibrated within the manufacturer’s
recommended interval if the building owner, management
organization, or tenant owns the meter (as applicable)
REFERENCED STANDARDS

U.S. Green Building Council LEED v5 Reference Guide for Operations and Maintenance, April 2025 Launch Edition 99