855773667-LEED-v5-O-M-Reference-Guide-Launch-Edition-1 - Page 133

Extracted Content

DOCUMENTATION
Project
types
OptionsPathsDocumentation

All
Option 1
All
ENERGY STAR® score

All
Option 1
All
ENERGY STAR® Data Verification Checklist with a
“For Year Ending” that aligns with the 12-month
reporting period

All
Options
2 and 3
Projects using
custom
source energy
factors

Published documentation for custom source energy
factors

All
Option 2

All
Compare the building’s site energy use intensity and
source energy use intensity (EUI) with the site EUI and
source EUI targets established for the project’s
building type(s) and climate zone in Appendix II based
on_ASHRAE_ 100-2024.

All
Option 2

All

For projects in the U.S. and Canada, confirm that the
property type is not eligible for an ENERGY STAR®
score.

All
Option 3
All

The historical baseline site (or source) energy
consumption per energy source for a 12-month
baseline reporting period with similar occupancy
occurring within the past eight years

All
Option 3
All

Narrative description of selected historical baseline
period confirming similar occupancy

All
Option 3
All

Compare the building’s total annual site and source
energy consumption for the 12-month reporting period
with the historical baseline site and source energy
consumption.

All
Option 3
All

Confirm that the property type is not eligible for an
ENERGY STAR® score

All
Option 3
All

If normalization is applied, documentation or
calculations supporting determination of normalized
results
High
process
load
projects
Option 3High process
load projects

Confirm the property type is not referenced in
Appendix II
High
process
load
projects
Option 3High process
load projects

Narrative description and energy load profile justifying
that the project meets the_High Process Load_
Buildings criteria
REFERENCED STANDARDS

U.S. Green Building Council LEED v5 Reference Guide for Operations and Maintenance, April 2025 Launch Edition 123