855773667-LEED-v5-O-M-Reference-Guide-Launch-Edition-1 - Page 173
Extracted Content
o The DES generates 50% of district heating capacity from refrigerant-using
equipment, supplying 50% of the project’s total thermal energy. Refrigerant Leakage Emissions Ratio of 30 is calculated for this equipment.
o The remaining 10% of the project’s annual thermal energy is generated from air
conditioning on-site. Refrigerant Leakage Emissions Ratio of 51 is calculated for this equipment.
o The building does not have any other refrigerant-using systems.
o 75% of the project’s total thermal energy is supplied from refrigerant-using
equipment:
o 75% = (50% x 50%) from DES Heat
o + (100% x 40%) from DES Cooling
o + (100% x 10%) from building systems
o Weighted average Refrigerant Leakage Emissions Ratio (RLER) is 24.8, which is
less than the maximum threshold of 25 required for 2 points.
𝑊 𝑊 ℎ𝑡 𝑡 𝐴 𝐴 𝐴 𝐴 𝑅 𝑅 = (50% × 50% × 30) + (100% × 40% × 15) + (100% × 10% × 51)
DOCUMENTATION
= 24.8
75%
| Project types | Options | Paths | Documentation |
|---|---|---|---|
Existing Buildings | All | All projects with refrigerants | Refrigerant leakage emissions ratio |
Existing Buildings | All | All projects with refrigerants | Attestation that all refrigerant-using equipment in the project is reported in refrigerant inventory and 12- month refrigerant leakage tracking, or narrative identifying allowed exclusions |
Existing Buildings | All | (Optional) If DES is included in determination | Weighted average refrigerant leakage emissions ratio |
Existing Buildings | All | No refrigerants | Confirm no refrigerant-using equipment is used in the project or in DES equipment serving the project |
REFERENCED STANDARDS
- None
U.S. Green Building Council LEED v5 Reference Guide for Operations and Maintenance, April 2025 Launch Edition 163