855773667-LEED-v5-O-M-Reference-Guide-Launch-Edition-1 - Page 173

Extracted Content

o The DES generates 50% of district heating capacity from refrigerant-using

equipment, supplying 50% of the project’s total thermal energy. Refrigerant Leakage Emissions Ratio of 30 is calculated for this equipment.

o The remaining 10% of the project’s annual thermal energy is generated from air

conditioning on-site. Refrigerant Leakage Emissions Ratio of 51 is calculated for this equipment.

o The building does not have any other refrigerant-using systems.

o 75% of the project’s total thermal energy is supplied from refrigerant-using

equipment:

o 75% = (50% x 50%) from DES Heat

o + (100% x 40%) from DES Cooling

o + (100% x 10%) from building systems

o Weighted average Refrigerant Leakage Emissions Ratio (RLER) is 24.8, which is

less than the maximum threshold of 25 required for 2 points.

𝑊 𝑊 ℎ𝑡 𝑡 𝐴 𝐴 𝐴 𝐴 𝑅 𝑅 = (50% × 50% × 30) + (100% × 40% × 15) + (100% × 10% × 51)

DOCUMENTATION

= 24.8 75%

Project
types
OptionsPathsDocumentation

Existing
Buildings
AllAll projects with
refrigerants
Refrigerant leakage emissions ratio

Existing
Buildings
AllAll projects with
refrigerants
Attestation that all refrigerant-using equipment in the
project is reported in refrigerant inventory and 12-
month refrigerant leakage tracking, or narrative
identifying allowed exclusions

Existing
Buildings
All(Optional) If DES
is included in
determination

Weighted average refrigerant leakage emissions
ratio

Existing
Buildings
All
No refrigerants
Confirm no refrigerant-using equipment is used in
the project or in DES equipment serving the project
REFERENCED STANDARDS
  • None

U.S. Green Building Council LEED v5 Reference Guide for Operations and Maintenance, April 2025 Launch Edition 163