855773667-LEED-v5-O-M-Reference-Guide-Launch-Edition-1 - Page 190

Extracted Content

DOCUMENTATION
Project
types
OptionsPathsDocumentation

All
Option 1
All
Confirm the demand side management processes in the
current facilities requirements (CFR) and operations and
maintenance (O+M) plan

All
Option 1
All

Confirm at least one full test of a demand response event
or automatic load-shedding event during the reporting
period

All
Option 1
Path 1

Contract with Demand Response Program Provider, and
evidence of participation during the reporting period

All
Option 1
Path 2

Narrative describing control system and how 10% of the
load will automatically be shed

All
Option 2All
Test results showing measured air leakage rates (and
subsequent test results if pursuing Option 2. Path 2)

All
Option 2All
Date(s) of test(s)
REFERENCED STANDARDS

U.S. Green Building Council LEED v5 Reference Guide for Operations and Maintenance, April 2025 Launch Edition 180