Energy and Atmosphere Credit
COMMISSIONING
EAc7
1–2 points
INTENT
To use the existing building commissioning process to improve building operations and energy and resource efficiency.
REQUIREMENTS
| Achievement pathways | Points |
|---|---|
Existing Building | 1–2 |
Option 1. Retro-Commissioning | 2 |
OR | |
Option 2. Monitoring-Based Commissioning | 1–2 |
Path 1. Basic MBCx | 1 |
OR | |
Path 2. Enhanced MBCx | 1 |
Option 1. Retro-commissioning (2 points)
Complete a retro-commissioning (RCx) process no more than three years before the end of the 12-month reporting period.
Engagement phase
- Engage a third-party retro-commissioning provider (RCxP) with experience on at least two projects of similar type and scale.
Planning phase
-
Assemble a project team to include, at a minimum, the RCxP, an owner’s representative, and the building operator.
-
Develop the owner’s objectives for the RCx process.
Assessment phase
-
Develop the RCx plan to include owner and tenant requirements, documentation requirements, regulatory requirements, etc.
-
Perform a site visit and site assessment, including functional tests.
U.S. Green Building Council LEED v5 Reference Guide for Operations and Maintenance, April 2025 Launch Edition 181