855773667-LEED-v5-O-M-Reference-Guide-Launch-Edition-1 - Page 199
Extracted Content
DOCUMENTATION
| Project types | Options | Path | Documentation |
|---|---|---|---|
Existing Buildings | Option 1 | All | Documentation of third-party retro-commissioning provider (RCxP) provider qualifications |
Existing Buildings | Option 1 | All | Summary of retro-commissioning (RCx) activities and RCx Plan |
Existing Buildings | Option 1 | All | RCx Final report |
Existing Buildings | Option 1 | All | Confirm Current Facilities Requirements (CFR) and Operations and Maintenance (O+M) Plan was updated and the building operator was trained |
Existing Buildings | Option 2 | Paths 1 and 2 | MBCx Plan including all required elements |
Existing Buildings | Option 2 | Paths 1 and 2 | Confirm training on EIS System for facility managers |
Existing Buildings | Option 2 | Paths 1 and 2 | Annual MBCx summary report. Report must confirm initiation of corrective action during reporting period to address anomalies or faults |
Existing Buildings | Option 2 | Path 2 | Evidence of Commitment or contract with third-party MBCx provider or qualifications of MBCx provider on the building operations team |
Existing Buildings | Option 2 | Path 2 | If applicable, confirm FDD training occurred within the past six years |
REFERENCED STANDARDS
- None
U.S. Green Building Council LEED v5 Reference Guide for Operations and Maintenance, April 2025 Launch Edition 189