855773667-LEED-v5-O-M-Reference-Guide-Launch-Edition-1 - Page 199

Extracted Content

DOCUMENTATION
Project
types
OptionsPathDocumentation

Existing
Buildings
Option 1
All
Documentation of third-party retro-commissioning provider
(RCxP) provider qualifications

Existing
Buildings
Option 1
All

Summary of retro-commissioning (RCx) activities and RCx
Plan

Existing
Buildings
Option 1
All

RCx Final report

Existing
Buildings
Option 1
All
Confirm Current Facilities Requirements (CFR) and
Operations and Maintenance (O+M) Plan was updated and
the building operator was trained

Existing
Buildings
Option 2Paths 1
and 2

MBCx Plan including all required elements

Existing
Buildings
Option 2Paths 1
and 2

Confirm training on EIS System for facility managers

Existing
Buildings
Option 2Paths 1
and 2

Annual MBCx summary report. Report must confirm
initiation of corrective action during reporting period to
address anomalies or faults

Existing
Buildings
Option 2Path 2
Evidence of Commitment or contract with third-party MBCx
provider or qualifications of MBCx provider on the building
operations team

Existing
Buildings
Option 2Path 2
If applicable, confirm FDD training occurred within the past
six years
REFERENCED STANDARDS
  • None

U.S. Green Building Council LEED v5 Reference Guide for Operations and Maintenance, April 2025 Launch Edition 189