855773667-LEED-v5-O-M-Reference-Guide-Launch-Edition-1 - Page 261
Extracted Content
DEVELOPING AN INFECTION RISK MANAGEMENT MODE
Projects pursuing this option must implement the capability of the building to operate in an Infection Risk Management Mode. This mode provides minimum equivalent clean airflow rates, calculated as the equivalent clean airflow rate per person multiplied by the anticipated number of people in a space. The building owner and facility manager must determine when to apply this mode of operation.
IMPLEMENT BUILDING READINESS PLAN
Preparatory steps and mitigation strategies that a facility will use before, during, and after an infection risk event (or period) must be documented in the IPp4: Current Facilities Requirements and O+M plan . In ASHRAE Standard 241-2023 this is called a building readiness plan.
DOCUMENTATION
| Project types | Option | Path | Documentation |
|---|---|---|---|
All | Option 1. Management Mode for Episodic Outdoor Ambient Conditions | All | Smoke Readiness Mode OR Documents confirming management mode design and sequence of operations |
All | Option 2. Management Mode for Respiratory Diseases | All | Infection Risk Management Mode OR Documents confirming management mode design and sequence of operations |
All | Option 2. Management Mode for Respiratory Diseases | All | Equivalent clean airflow calculator |
REFERENCED STANDARDS
- None
U.S. Green Building Council LEED v5 Reference Guide for Operations and Maintenance, April 2025 Launch Edition 251