897003948-BD-C-Impact-Area-View - Full Extract
PDF Page 1
| Col1 | Col2 | Col3 | Col4 | Col5 | Col6 | Col7 | Col8 | Col9 | Col10 | Col11 | Col12 | Col13 | Col14 | Col15 | Col16 | Col17 | Col18 | Col19 | Col20 | Col21 | Col22 | Col23 | Col24 | Col25 |
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| LEED v5 for Building Design and Construction: New Construction | LEED v5 for Building Design and Construction: New Construction | LEED v5 for Building Design and Construction: New Construction | LEED v5 for Building Design and Construction: New Construction | LEED v5 for Building Design and Construction: New Construction | LEED v5 for Building Design and Construction: New Construction | LEED v5 for Building Design and Construction: New Construction | LEED v5 for Building Design and Construction: New Construction | LEED v5 for Building Design and Construction: New Construction | LEED v5 for Building Design and Construction: New Construction | |||||||||||||||
Project scorecard | Project scorecard | Project scorecard | Project scorecard | |||||||||||||||||||||
| Yes | Maybe | No | Decarbonization | Decarbonization | New Construction | Yes | Maybe | No | Quality of Life | Quality of Life | New Construction | Yes | Maybe | No | Ecosystem Conservation and Restora | Ecosystem Conservation and Restora | New Construction tion | |||||||
| Y | IP Prereq | Carbon Assessment | Required | Y | IP Prereq | Climate Resilience Assessment | Required | Y | IP Credit | Integrative Design Process | 1 | |||||||||||||
| 0 | 0 | 0 | IP Credit | Integrative Design Process | 1 | Y | Y | Y | Y | IP Prereq | Human Impact Assessment | Required | 0 | 0 | 0 | LT Credit | Sensitive Land Protection | 1 | ||||||
| 0 | 0 | 0 | LT Credit | Compact and Connected Development | 6 | Y | Y | Y | Y | IP Credit | Integrative Design Process | 1 | 0 | 0 | 0 | LT Credit | Compact and Connected Development | 6 | ||||||
| 0 | 0 | 0 | LT Credit | Transportation Demand Management | 4 | 0 | 0 | 0 | LT Credit | Equitable Development | 2 | Y | SS Prere | qMinimized Site Disturbance | Required | |||||||||
| 0 | 0 | 0 | LT Credit | Electric Vehicles | 2 | 0 | 0 | 0 | LT Credit | Compact and Connected Development | 6 | 0 | 0 | 0 | SS Credit | Biodiverse Habitat | 2 | |||||||
| 0 | 0 | 0 | SS Credit | Heat Island Reduction | 2 | 0 | 0 | 0 | LT Credit | Transportation Demand Management | 4 | 0 | 0 | 0 | SS Credit | Accessible Outdoor Space | 1 | |||||||
| Y | WE Prere | qMinimum Water Efficiency | Required | 0 | 0 | 0 | SS Credi | tAccessible Outdoor Space | 1 | 0 | 0 | 0 | SS Credit | Rainwater Management | 3 | |||||||||
| 0 | 0 | 0 | WE Credi | tWater Metering and Leak Detection | 1 | 0 | 0 | 0 | SS Credi | tEnhanced Resilient Site Design | 2 | 0 | 0 | 0 | SS Credit | Enhanced Resilient Site Design | 2 | |||||||
| 0 | 0 | 0 | WE Credi | tEnhanced Water Efficiency | 8 | 0 | 0 | 0 | SS Credi | tHeat Island Reduction | 2 | 0 | 0 | 0 | SS Credit | Heat Island Reduction | 2 | |||||||
| Y | EA Prere | qOperational Carbon Projection and Decarbonizati | on PlanRequired | 0 | 0 | 0 | WE Credi | tWater Metering and Leak Detection | 1 | 0 | 0 | 0 | SS Credit | Light Pollution Reduction | 1 | |||||||||
| Y | Y | Y | Y | EA Prere | qMinimum Energy Efficiency | Required | 0 | 0 | 0 | MR Credi | tLow Emitting Materials | 2 | Y | WE Prere | qWater Metering and Reporting | Required | ||||||||
| Y | Y | Y | Y | EA Prere | qFundamental Commissioning | Required | 0 | 0 | 0 | MR Credi | tBuilding Product Selection and Procure | ment 5 | Y | Y | Y | Y | WE Prere | qMinimum Water Efficiency | Required | |||||
| Y | Y | Y | Y | EA Prere | qEnergy Metering and Reporting | Required | Y | EQ Prere | qConstruction Management | Required | 0 | 0 | 0 | WE Credi | tWater Metering and Leak Detection | 1 | ||||||||
| Y | Y | Y | Y | EA Prere | qFundamental Refrigerant Management | Required | Y | Y | Y | Y | EQ Prere | qFundamental Air Quality | Required | 0 | 0 | 0 | WE Credi | tEnhanced Water Efficiency | 8 | |||||
| 0 | 0 | 0 | EA Credit | Electrification | 5 | Y | Y | Y | Y | EQ Prere | qNo Smoking or Vehicle Idling | Required | Y | MR Prere | qPlanning for Zero Waste Operations | Required | ||||||||
| 0 | 0 | 0 | EA Credit | Reduce Peak Thermal Loads | 5 | 0 | 0 | 0 | EQ Credi | tEnhanced Air Quality | 1 | 0 | 0 | 0 | MR Credi | tBuilding and Materials Reuse | 3 | |||||||
| 0 | 0 | 0 | EA Credit | Enhanced Energy Efficiency | 10 | 0 | 0 | 0 | EQ Credi | tOccupant Experience | 7 | 0 | 0 | 0 | MR Credi | tBuilding Product Selection and Procure | ment 5 | |||||||
| 0 | 0 | 0 | EA Credit | Renewable Energy | 5 | 0 | 0 | 0 | EQ Credi | tAccessibility and Inclusion | 1 | 0 | 0 | 0 | MR Credi | tConstruction and Demolition Waste Div | 2 | |||||||
| 0 | 0 | 0 | EA Credit | Enhanced Commissioning | 4 | 0 | 0 | 0 | EQ Credi | tResilient Spaces | 2 | Y | EQ Prere | qNo Smoking or Vehicle Idling | Required | |||||||||
| 0 | 0 | 0 | EA Credit | Grid Interactive | 2 | 0 | 0 | 0 | EQ Credi | tAir Quality Testing and Monitoring | 2 | |||||||||||||
| 0 | 0 | 0 | EA Credit | Enhanced Refrigerant Management | 2 | |||||||||||||||||||
| Y | MR Prere | qPlanning for Zero Waste Operations | Required | |||||||||||||||||||||
| Y | Y | Y | Y | MR Prere | qQuantify and Assess Embodied Carbon | Required | ||||||||||||||||||
| 0 | 0 | 0 | MR Credi | tBuilding and Materials Reuse | 3 | |||||||||||||||||||
| 0 | 0 | 0 | MR Credi | tReduce Embodied Carbon | 6 | |||||||||||||||||||
| 0 | 0 | 0 | MR Credi | tBuilding Product Selection and Procurement | 5 | |||||||||||||||||||
| 0 | 0 | 0 | MR Credi | tConstruction and Demolition Waste Diversion | 2 | |||||||||||||||||||
| 0 | 0 | 0 | Total | Total | 0 | 0 | 0 | Total | Total | 0 | 0 | 0 | Total | Total | ||||||||||
| 0 | 0 | 0 | Total (all credit categories) | Total (all credit categories) | ||||||||||||||||||||