Energy and Atmosphere

The Energy and Atmosphere (EA) credit category in LEED v5 aims to facilitate the design and construction of low-carbon buildings by increasing carbon literacy and providing a clear framework for reducing or eliminating emissions. It focuses on three critical steps for decarbonization: electrification, reduced peak thermal loads, and energy efficiency. The category introduces new credits for electrification and reduced peak thermal loads, while maintaining a strong emphasis on energy efficiency. Additional strategies include enhanced commissioning, renewable energy, grid-interactive systems, and refrigerant management. These approaches can lead to reduced operational costs, improved resilience, and enhanced value for building owners, occupants, and communities.

LEED v5 Platinum-certified projects are expected to achieve industry best practices in energy efficiency, eliminate on-site combustion (except for emergencies), use 100% renewable energy, and reduce embodied carbon. The EA category ultimately supports the goal of decarbonizing buildings by mid-century to combat global energy emissions.

PrerequisiteFundamental Commissioning and Verification
  • Replaced all previously referenced standards with ASNI/ASHRAE/IES Standard 90.1 as the commissioning requirements without Section 4.2.5.2 exceptions.
  • Removed allowance for the CxP to be a qualified member of the design or construction team for projects smaller than 20,000 square feet or data center projects.
  • Modified requirement such that the CxP is to assist in the development, reviewing, and updating of the Owner’s Project Requirements (OPR).
  • Added CxP attendance of one or more meetings with the design team focused on MEP and envelope review comments.
  • Added CxP review of submittals and substitutions for design deviations.
  • Added CxP attendance of 50% and 100% construction milestone meetings.
  • Added 10% sample review of completed contractor documentation.
  • Added requirement of envelope CxP to include testing in Cx documents and witness of sample of tests (not required by Core + Shell).
  • Moved ongoing commissioning plan requirement from enhanced commissioning credit to fundamental commissioning credit.
  • Removed current facilities requirements and operations and maintenance plan development.
PrerequisiteMinimum Energy Performance
  • Prerequisite renamed to: EAp Minimum Energy Efficiency.
  • Moving from ASHRAE 90.1-2010 to ASHRAE 90.1-2019 or 2022 versions.
  • Option 1: (before 2028 only) comply with ASHRAE 90.1-2019 via energy cost or future source energy.
  • Option 2: comply with ASHRAE 90.1-2022 via energy cost, future source energy, source energy, or site energy.