855773520-LEED-v5-ID-C-Reference-Guide-Launch-Edition-1 - Page 046

Extracted Content

Integrative Process, Planning and Assessments Credit

INTEGRATIVE DESIGN PROCESS

IPc1

1 point

INTENT

To support high-performance, cost-effective, and cross-functional project outcomes through an early analysis and planning of the interrelationships among systems. To provide a holistic framework for project teams to collaboratively address decarbonization, quality of life, and ecosystem conservation and restoration across the entire LEED rating system.

REQUIREMENTS
Achievement pathwaysPoints

Commercial Interiors

1

Integrative Design Process

1

OR



LEED-certified Building

1

Integrative Design Process

Beginning in predesign and continuing through early occupancy, identify and apply opportunities to achieve synergies across disciplines and building systems through the following initiatives:

  • Integrated team : Assemble and convene an interdisciplinary project team with diverse perspectives. Ensure the process is an equitable team effort through organized facilitation.

  • Design charrette : During predesign or early in design, conduct a charrette with the owner or owner’s representative and participants representing at least 4 key perspectives (e.g., architect, contractor, energy modeler, or community engagement representatives).

  • LEED goal-setting : Work as a team to define a set of specific and measurable project goals that address the LEED v5 impact areas of decarbonization, quality of life, and ecosystem conservation and restoration. Incorporate these goals into the owner’s project requirements (OPR).

OR

LEED-certified Building (1 point)

Locate the project in a LEED-certified building.

U.S. Green Building Council LEED v5 Reference Guide for Interior Design and Construction, April 2025 Launch Edition 35