Example Calculation 2 A tenant develops new office space in a building with 125 surface lot parking spaces. The base building does not have a previous LEED certification. The surface lot includes charging stations for seven parking spaces, including one accessible parking space. The LEED ID+C: Commercial Interiors project earns one point under Option 2.
125 × 0.05 = 12.5 𝑠 𝑠 𝑠 = 7 𝑟 𝑟 𝑟 𝑟 𝑠 𝑠 𝑠, 𝑖 𝑖 𝑖 𝑖 𝑖 1 𝑠 𝑠 𝑠 𝑓 𝑓 𝑎 𝑎 𝑎 𝑎 𝑎 𝑝 𝑝 𝑝 𝑝
DOCUMENTATION
| Project types | Options | Paths | Documentation |
|---|---|---|---|
All | Option 1. Certified Base Building with LEED BD+C | All | LEED-certified base building project ID. |
All | Option 1. Certified Base Building with LEED BD+C | All | Confirmation that the project is located in a LEED v4/v4.1 certified base building or LEED v5 BD+C v5 certified base building that earned the LT Credit Green/Electric Vehicles. |
All | Option 1. Certified Base Building with LEED BD+C | All | Equivalent LEED ID+C: Commercial Interiors points earned. |
All | Option 2. EVSE | Site plan indicating the total number of parking spaces used by the project and the total number of spaces with EVSE, including clear identification of at least 1 EVSE in an accessible parking space. | |
All | Option 2. EVSE | Confirmation that the accessible parking space is at least 9 feet (2.5 meters) wide with a 5-foot (1.5-meter) access aisle and has charging station accessibility features for use by persons with mobility, ambulatory and visual limitations. | |
All | Option 2. EVSE | Calculation documenting the percentage of parking spaces with_EVSE_ (including break-out for accessible parking spaces). | |
All | Option 2. EVSE | Evidence that_EVSE_ meet all criteria identified in the credit requirements (for example, product information from manufacturer or contract specification). |
REFERENCED STANDARDS
U.S. Green Building Council LEED v5 Reference Guide for Interior Design and Construction, April 2025 Launch Edition 68