855773520-LEED-v5-ID-C-Reference-Guide-Launch-Edition-1 - Page 087
Extracted Content
DOCUMENTATION
| Project types | Options | Paths | Documentation |
|---|---|---|---|
| All | All | All | Contract document(s) specifying the project’s commercial kitchen equipment water use, including performance specifications. |
| All | All | All | Contract document(s) specifying the project’s process water equipment, including performance specifications. |
| All | All | All | Contract document(s) specifying the project’s appliances, equipment, and process water equipment, including performance specifications. |
| All | All | All | Contract document(s) specifying the project’s plumbing fixtures and fittings, including performance specifications. |
| All | All | All | LEED v5 Fixture and Fittings Efficiency calculator, documenting the fixtures/fittings within the tenant space and the occupants who use them. |
REFERENCED STANDARDS
U.S. Green Building Council LEED v5 Reference Guide for Interior Design and Construction, April 2025 Launch Edition 76