balance model from WEc2: Enhanced Water Efficiency, Option 1. Whole Project Water Use, as it may optimize points for this credit.
AND/OR
Option 4. Optimize Process Water Use
Cooling towers and industrial processes use a significant amount of potable water. Projects that include these systems must consider opportunities to reduce cycles of concentration, optimize water use for cooling, or select alternative water sources.
Process water uses include, but are not limited to, cooling, humidification, sterilization, dishwashers, clothes washers, and pools. This option offers three pathways, which depend on the type of process water use. Path 3 also requires that process water use meets a minimum percentage of the total building water use.
PATH 1. LIMIT COOLING TOWER CYCLES
This path prioritizes water conservation for cooling towers by limiting the cycles of concentration from the equipment. A cycle of concentration is the number of times water can circulate through the system without creating performance or operational problems. A low cycle of concentration means more single-use water passes through the system, resulting in excess water consumption. However, as water is reused, dissolved solids remain, which increases the concentration levels of calcium, silicon dioxide (SiO2), and chloride. Higher cycles of concentration may result in scaling and corrosion issues.
The intent of the credit is not to impact system operations, but to inform designers on alternative solutions for reducing water consumption for cooling processes. Finding the correct balance of cooling tower blowdown and chemical treatment maintains system efficiency, reduces maintenance, and conserves potable water.
For each cooling process, conduct a potable water analysis to determine setpoints for the chemical treatment system and the associated cycles of concentration. Teams must confirm that the systems will operate at the specified cycles of concentration and not exceed parameters outlined in Table 6.
Projects with alternative water sources Projects using alternative water sources do not require one-time water analysis. Using a minimum of 20% alternative water can help projects earn two points, if the maximum calculated number of cycles is also met.