855773520-LEED-v5-ID-C-Reference-Guide-Launch-Edition-1 - Page 136

Extracted Content

Col1Design
Document
Reviews
(Design
Drawings and
Specifications).
Section
4.2.5.2,
4.2.5.2.2
Section 10.2,
10.3
Full drawing and specification
review for systems to be
commissioned.
Fundamental and Enhanced:
detail compliance with the OPR
and provisions in respective
standards.
Each design review to include
issues log for tracking/resolution
of issues.
Enhanced: Back-check review
to confirm if
recommendations/comments
have been addressed.

Attend
coordination /
design
meetings to
discuss review
comments and
commissioning.
Required by
LEED
Required by
LEED

Fundamental and Enhanced:
Minimum of one
coordination/design review
meeting to discuss design review
comments.



Update to OPR
Required for
LEED
Section 6.2,
6.3
Fundamental and Enhanced:
Update OPR as needed prior to
end of Design Phase.
Construction
phase
Pre-
construction
kick-off meeting
Not required
Section
12.2.4
Enhanced: CxP shall conduct a
Cx kick-off and scoping meeting
with the project team to explain
Cx procedures and coordinate
Cx Activities throughout the
construction phase.
Construction
phase
Update Cx plan
Not required
Section 7.2,
7.3

Enhanced: Update Cx plan at
least once per phase (DD, CD,
Construction).
Construction
phase
Submittal
review
Required by
LEED
Section 11.2,
11.3
Fundamental: Review
submittals/substitutions for
design deviations that impact the
OPR

Enhanced: Thorough review of
relevant building system
submissions for compliance with
the design documents and OPR
ScheduleRequired
relative to
other tasks
Section
7.2.3.d

Fundamental: Ensure Cx
requirements/ milestones are
included in the project
construction schedule.

Enhanced: Detailed description
of Cx activities and a schedule of

U.S. Green Building Council LEED v5 Reference Guide for Interior Design and Construction, April 2025 Launch Edition 125