Col1Col2Col3Col4activities. Schedule is included in
the Cx plan.



Field reviews
Section
4.2.5.1
Section
12.2.6
Fundamental: Minimum of one
site visit to verify Cx readiness.

Enhanced: Minimum of one site
visit to review contractor
completed construction
checklists. A checklist for each
major system type should be
reviewed during the site visit.



Testing
(review/witness
performance
testing)
Section
4.2.5.2
Section
12.2.6

Fundamental and Enhanced:
Minimum of one site visit to
witness execution of functional-
performance testing, per the
scope of the project.



Meetings
Required by
LEED
Required by
LEED
Fundamental: At least one
meeting to discuss review
comments and commissioning

Enhanced: At least two
milestone meetings (i.e., 25%,
50%, 75%, and 100% of
schedule).



QA/QC
Documentation
(checklist and
tests)
Required by
LEED
Section
12.2.2a,
12.2.6.c

Fundamental: Sample review of
completed contractor
documentation (i.e., 10%)

Enhanced: Additional reviews of
completed contractor
documentation (i.e., 25%)



Track Identified
Issues to
Resolution
(Issues /
Resolution Log)


4.2.5.1,
4.2.5.2


Section 13.2,
13.3




Fundamental: Include (I/R) log
in the Preliminary Cx Report
Enhanced: A formal I/R log shall
be maintained throughout the
project until all issues are
resolved or accepted by the
owner. Include the final I/R log,
with all items closed, in the final
Cx report.




Systems
Manual

Not Required

Section 14.2,
14.3

Enhanced: Compile the systems
manual, which includes all
information needed to
understand, operate, and
maintain the building’s systems
and assemblies.

U.S. Green Building Council LEED v5 Reference Guide for Interior Design and Construction, April 2025 Launch Edition 126