| Col1 | Operations and Maintenance Manual | Not Required | Required for LEED | Enhanced: Compile an operations and maintenance manual from contractor submissions. |
|---|---|---|---|---|
| Preliminary Commissioning Report | 4.2.5.1.2, 4.2.5.2.2 | Section 17.2.1 | Fundamental and Enhanced: Completion of LEED online documentation as well as report summarizing Cx activities to end of construction phase, including OPR, Cx plan and reports. | |
Occupancy / Operations Phase | Review Training Program | 4.5.2.2.2.c.5 | Section 15.2, 15.3 | Fundamental: Review the training plan. Enhanced: Review the training plan and confirm that it has been implemented. Include training plan in the systems manual. |
Occupancy / Operations Phase | Post- Occupancy Review | Not Required | Section 16.2, 16.3 | Enhanced: Conduct minimum of one in-person, post-occupancy site visit with facility maintenance staff (or similar) prior to end of the warranty period. |
Occupancy / Operations Phase | Final Commissioning Report | 4.2.5.2.2 | Section 17.2.3 | Full report summarizing Cx activities, including occupancy phase activities |
Occupancy / Operations Phase | Ongoing_Cx_ Plan | Not Required | Required for LEED | Enhanced: Provide an ongoing Cx plan that allows project operators to maintain high performance. At minimum, include a set of blank forms for future use by the LEED AP O+M team. |