855773520-LEED-v5-ID-C-Reference-Guide-Launch-Edition-1 - Page 138

Extracted Content

Col1Operations and
Maintenance
Manual
Not RequiredRequired for
LEED
Enhanced: Compile an
operations and maintenance
manual from contractor
submissions.
Preliminary
Commissioning
Report
4.2.5.1.2,
4.2.5.2.2
Section
17.2.1

Fundamental and Enhanced:
Completion of LEED online
documentation as well as report
summarizing Cx activities to end
of construction phase, including
OPR, Cx plan and reports.

Occupancy /
Operations
Phase
Review
Training
Program
4.5.2.2.2.c.5
Section 15.2,
15.3

Fundamental: Review the
training plan.

Enhanced: Review the training
plan and confirm that it has been
implemented. Include training
plan in the systems manual.

Occupancy /
Operations
Phase
Post-
Occupancy
Review
Not Required
Section 16.2,
16.3

Enhanced: Conduct minimum of
one in-person, post-occupancy
site visit with facility maintenance
staff (or similar) prior to end of
the warranty period.

Occupancy /
Operations
Phase
Final
Commissioning
Report
4.2.5.2.2
Section
17.2.3

Full report summarizing Cx
activities, including occupancy
phase activities

Occupancy /
Operations
Phase

Ongoing_Cx_
Plan
Not RequiredRequired for
LEED

Enhanced: Provide an ongoing
Cx plan that allows project
operators to maintain high
performance. At minimum,
include a set of blank forms for
future use by the LEED AP O+M
team.

U.S. Green Building Council LEED v5 Reference Guide for Interior Design and Construction, April 2025 Launch Edition 127