Energy and Atmosphere Prerequisite

FUNDAMENTAL REFRIGERANT MANAGEMENT

EAp5

REQUIRED

INTENT

To reduce GHG emissions from refrigerants by accelerating the phaseout of refrigerants with high global warming potential (GWP) and by reducing refrigerant leakage.

REQUIREMENTS
Achievement pathwaysPoints

Commercial Interiors

N/A

Option 1. No Refrigerants


OR

OR

Option 2. Refrigerants

Option 2. Refrigerants

Option 1. No Refrigerants

Do not use refrigerants in the project.

OR

Option 2. Refrigerants

Meet the following requirements for refrigerant-containing equipment installed, replaced, or altered in the project scope of work:

  • Complete refrigerant inventory : Complete an inventory of the refrigerant-containing equipment installed within the project scope of work and any existing equipment under control of the tenant. The inventory shall include the refrigerant type, GWP, amounts of refrigerants contained in each, and the total GWP of all refrigerants.

  • Do not use hydrochlorofluorocarbon (HCFC) refrigerants in new equipment.

  • Evaluate available alternatives during the design process for any refrigerants with GWP

  • Leak check and repair. Prior to substantial completion, check both new and existing refrigerant-containing equipment for refrigerant leaks and repair all leaks identified. For systems with field-assembled joints, perform a leak check, vacuum check, and pressure check prior to charging with refrigerant.