855773520-LEED-v5-ID-C-Reference-Guide-Launch-Edition-1 - Page 150

Extracted Content

Table 2. Refrigerant-containing equipment

ApplicationEquipment/System Type

HVAC, Space Cooling Equipment

Stationary Air Conditioners and Heat Pump
Chillers
Computer Room Air Conditioning Units
Service Water Heaters

Heat pump Service Water Heaters

Retail

Food Refrigeration
Cold Storage
Commercial

Vending Machines
Ice Machines
Industrial Process Refrigeration

Process Chillers
Ice Rink Chillers
Other Process Refrigeration

Data collection For each piece of equipment, document the refrigerant properties, including type of refrigerant, refrigerant GWP (GWPREFRIGERANT), and refrigerant charge (Rc).

When the project design includes field-assembled refrigerant piping with long pipe lengths or large pressure drops (e.g., variable refrigerant flow (VRF) systems, industrial process equipment), teams must account for additional required Rc in the calculations per manufacturer’s specifications or confirm that the manufacturer’s default charge or referenced submittals already account for this additional charge.

Calculate the total equipment GWP for each equipment using Equation 1.

Equation 1. GWPEQUIPMENT calculation

calculation

𝐸 𝐸 𝐸 𝐸 𝐸𝐸 [= 𝑅𝑅] 𝐶𝐶 [× 𝐺] 𝑅 𝑅 𝑅 𝑅 𝑅 𝑅𝑅 𝐺 𝐺𝐺 𝐺𝐺

The project’s total GWP is the sum of the GWP s for all refrigerant-using equipment in the project:

Equation 2. GWPTOTAL calculation

𝑇 𝑇 𝑇𝑇 𝐸 𝑈𝑈𝐼 𝐼 𝐼 𝐺 𝐺𝐺 = � 𝐺 𝐺𝐺

Determine the weighted average GWP for the project by dividing the project’s total GWP by the sum of refrigerant charge for all equipment:

Equation 3. Weighted average GWP calculation

𝑇 𝑇 𝐿 𝐺 𝑊 𝑊 ℎ𝑡 𝑡𝑡 𝐴 𝐴 𝐴 𝐴𝐴 𝐺 𝐺𝐺 = [𝐺] 𝐶 𝛴𝑅

U.S. Green Building Council LEED v5 Reference Guide for Interior Design and Construction, April 2025 Launch Edition 139