In scope (2 points)

  • Cooking, laundry, process heating, process drying, and/or on-site power generation are installed within the project scope.

The following equipment may be excluded:

  • Process heating equipment designed for operation at low temperatures

Option 3. No On-Site Combustion, Limited Scope (1–3 points)

For the project scope of work:

  • Do not install on-site combustion equipment in the project scope of work.

  • Combined weighted average equipment efficiency for new space heating and SWH must be at least 1.8 COP for initial build-out construction or at least 1.2 COP for alterations.

The following equipment may be excluded from the COP determination:

  • Space heating equipment in climate zones 0–2

  • Supplemental heating equipment designed only for operation at low temperatures

  • SWH equipment in nonresidential spaces complying with the point-of-use water heater criteria in ASHRAE 90.1-2022, Section 11.5.2.3.3, W05, without exceptions

Points are awarded according to Table 1 based on the minimum project scope of work.

Table 1. Points for no on-site combustion, limited scope

Minimum project scope of workPoints

One or more cooking, heating, SWH, or process heating systems

1

At least 20% of the project’s peak combined heating and SWH load, or all commercial
cooking equipment

2

At least 50% of the project’s peak combined heating and SWH load, or all commercial
cooking equipment
3

OR

Option 4. Base Building Documentation and Tenant Compliance (5 points)

Points are awarded according to Table 2. Locate in a building that has documented a LEED credit per Table 2.

AND/OR

Meet the following criteria per system type in the project scope of work. The system types are defined as:

U.S. Green Building Council LEED v5 Reference Guide for Interior Design and Construction, April 2025 Launch Edition 144