855773520-LEED-v5-ID-C-Reference-Guide-Launch-Edition-1 - Page 168

Extracted Content

Heating Equipment TypeHeating Equipment
Efficiency Rating
Equation to Convert
to COP
Test
Procedure

COPH at 17°F db/15°F
wb (–8.3°C db/–9.4°C
wb), High leaving
heating water
temperature = 140°F
(60 °C)

= 1.37 x COPH

Water source electrically
operated positive
displacement.
(COPH evaluated at 54°F
(19°C) source water entering
temperature / 44 °F (7°C)
source water leaving
temperature).

COPH
Low leaving hot water
temperature = 105°F
(40 °C)
= COPH
AHRI 550/590
Water source electrically
operated positive
displacement.
(COPH evaluated at 54°F
(19°C) source water entering
temperature / 44 °F (7°C)
source water leaving
temperature).

COPH
Medium leaving hot
water temperature =
120°F (50 °C)
= 1.26 x COPH
= 1.26 x COPH
Water source electrically
operated positive
displacement.
(COPH evaluated at 54°F
(19°C) source water entering
temperature / 44 °F (7°C)
source water leaving
temperature).

COPH
High leaving hot water
temperature = 140°F
= 1.73 x COPH
= 1.73 x COPH
Water source electrically
operated positive
displacement or centrifugal.
(at 75°F / 65 °F source
entering / leaving water
temperature).

COPH
Boost leaving hot water
temperature = 140°F
(60 °C)
= 1.31 x COPH
AHRI 550/590

Electric furnace
AFUE
= 1.0 x AFUE
10 CFR 430
Appendix N
Electric boiler
None listed
COP = 0.96 if not
rated

10 CFR 430
Electric service hot water
heaters
COP
50°F (10°C) entering air
and 60°F (21°C)
entering water

= COP
AHRI Standard
1301
Electric service hot water
heaters

UEF
= UEF x 1.310 CFR 430
Appendix E

NOTE: Equations to convert HSPF, HSPF2, and SCOP2 to COP are from ASHRAE 90.1-2019 11.5.2(c) and 90.1-2022 12.5.2(c). The remaining conversions are rough approximations not accounting for variability in standby losses or other factors referenced in the test procedures.

District Energy Systems (DES)

If the project is supplied with thermal energy from a DES, for Options 1 and 2, either refer to DES compliance paths in the Project Priorities Library, or demonstrate that the DES complies with the following credit requirements at the district facility:

OPTION 1. NO ON-SITE COMBUSTION — BASE BUILDING AND TENANT SYSTEMS

No on-site combustion may be used in the district energy facility to generate heating, cooling, or electricity supplied to the project. Average district heating efficiency must be at least 1.8 for initial buildout projects, or at least 1.2 for projects in existing buildings.

U.S. Green Building Council LEED v5 Reference Guide for Interior Design and Construction, April 2025 Launch Edition 157