855773520-LEED-v5-ID-C-Reference-Guide-Launch-Edition-1 - Page 170

Extracted Content

o Electric incinerators for medical waste

o Fireplaces, hearths, and fire pits exclusively designated to support ceremonial

practices (such as those unique to indigenous cultures or religious practices that require the use of fire)

These special circumstances do not extend more broadly to process equipment except where approved on a project-specific basis for systems with very low GHG emissions.

Platinum Requirements

Projects that aim to achieve LEED Platinum cannot install new on-site combustion equipment in the project scope of work. This includes alterations replacing existing systems with new systems, such as replacement of gas furnaces or gas cooktops.

Platinum projects may replace components that use base building systems fueled by on-site combustion, such as fan coils supplied by a central natural gas boiler.

The LEED Platinum requirements intentionally encompass industrial and manufacturing processes. On-site boilers used for manufacturing production must comply with the credit criteria to obtain LEED Platinum certification.

Exceptions to LEED Platinum requirements, such as for renewable fuels, may be included in the Project Priorities Library.

DOCUMENTATION
Project
types
OptionsPathsDocumentation

All
AllAllDocumentation that the project is subject to local code that
requires full electrification down to 20 °F (-6.5 °C) or lower.
Provide relevant code language and applicability. (if
applicable).

All
AllAll
Provide equipment cutsheets or schedules for all heating,
SWH, solar water heating, and process heating equipment
within the project. Include information on the energy source,
equipment quantity, and the capacity and efficiency for
each piece of equipment.

All
AllAll
Document emergency support and on-site generation
equipment including system type, fuel source and capacity.

All
AllAll
Description of emergency support and on-site generation
equipment and how it is used on-site. Include estimated
annual run-time for any combustion equipment.

All
AllAll
Weighted average COP calculation, as applicable for SWH
and space heating. Project may determine weighted

U.S. Green Building Council LEED v5 Reference Guide for Interior Design and Construction, April 2025 Launch Edition 159