Project
types
OptionsPathsDocumentation
average COP using a streamlined, rated capacities, or
energy simulation.
Option 1


Narrative or mechanical drawings showing that systems
used for heating, SHW, and cooking and other process
loads are not fueled by on-site combustion.
Option 2
All

Sequence of operations for hybrid electric/nonelectric
systems and evidence that electric equipment (electric
mode) can meet space heating, SHW, and process heating
loads >20F (as applicable). Evidence may include
equipment capacities and accompanying design load
calculations, energy simulation reports, or other.
Option 2
All

For projects attempting no on-site combustion except at low
temperatures, document how the applicable systems can
operate without on-site combustion at outside air
temperatures above 20°F (-6.5 °C).
Option 2
Path 3

Systems in scope of work (cooking, laundry, other process).
Option 3
All
Systems in scope of work (cooking, laundry, other process).
Option 3
All
Schedules or cutsheets showing electrified equipment.
Option 3
All
Calculation of the installed space heating and SWH
equipment capacity as a percentage of the project’s peak
combined heating and SWH load.
Option 4All
LEED project number for base building
Option 4AllSystems in scope of work (space heating, SWH, cooking,
laundry, other process)
Option 4All
Equipment schedules or cutsheets showing electrified
equipment.
REFERENCED STANDARDS

U.S. Green Building Council LEED v5 Reference Guide for Interior Design and Construction, April 2025 Launch Edition 160