guidance. Calculate the PI and percentage improvement with and without the plug and process savings.

  • Calculate the PI and performance index target (PIt) as follows:

    • PInre = PBPnre / BBP

    • PI = PBP / BBP

    • PIt = [BBUE + (BPF x BBRE)] / BBP where :

o PInre = PI for future source energy excluding on-site renewable contribution

o PI = PI for future source energy including on-site renewable contribution

o PIt = performance index target for future source energy use

o BBP = baseline building performance for baseline building future source

energy use

o BBUE = baseline building unregulated future source energy use

o BBRE = baseline building regulated future source energy use

o PBPnre = proposed building performance without any credit for reduced

annual future source energy from on-site renewable energy generation systems

o PBP = proposed building performance, including the reduced annual future

source energy associated with all on-site renewable energy generation systems

Points are awarded according to Table 6, using either Path 1 or Path 2.

Table 6. Points for percentage improvement in PI below PIt

Path 1. Percentage reduction
excluding on-site renewable
contribution (100%–PI / PI)
nre t
ORPath 2. Percentage reduction
excluding on-site renewable
contribution (100%–PI / PI)
t
Points

0%

5%
2

2%

2%
10%

3

4%

4%
20%

4

6%

6%
30%

5

8%

8%
40%

6

10%

10%
50%

7

12%

12%
60%

8

14%

14%
70%

9

16%

16%
80%

10

18%

18%
90%

11

20%

20%
100%
12

U.S. Green Building Council LEED v5 Reference Guide for Interior Design and Construction, April 2025 Launch Edition 166